US3301661A - Process and apparatus for producing iron and steel - Google Patents

Process and apparatus for producing iron and steel Download PDF

Info

Publication number
US3301661A
US3301661A US442760A US44276065A US3301661A US 3301661 A US3301661 A US 3301661A US 442760 A US442760 A US 442760A US 44276065 A US44276065 A US 44276065A US 3301661 A US3301661 A US 3301661A
Authority
US
United States
Prior art keywords
stack
iron
section
vessel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US442760A
Inventor
James J Mcglynn
James L Ma
William H Funk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lukens Inc
Original Assignee
Lukens Steel Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lukens Steel Co filed Critical Lukens Steel Co
Priority to US442760A priority Critical patent/US3301661A/en
Application granted granted Critical
Publication of US3301661A publication Critical patent/US3301661A/en
Assigned to LUKENS, INC. reassignment LUKENS, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: LUKENS STEEL COMPANY
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/32Blowing from above
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/56Manufacture of steel by other methods
    • C21C5/562Manufacture of steel by other methods starting from scrap
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the present application provides for improvements and additions to the previously disclosed inventive concepts but the objectives stated in the parent applications remain generally the same. However, added emphasis is placed on the present developments versatility in being capable of using scrap and other sources of iron as well as coke, coal and other fuels. Accordingly, it is an object of the present invention to provide an improved method and apparatus for the production of iron and steel that are economical and flexible. It is a further object of the present inventionto provide a method and apparatus for the production of iron and steel that are capable of using inexpensive raw materials. It is another object of the present invention to provide a method and apparatus for the production of iron and steel that conserve heat and fuel.
  • FIGURE 1 is a schematic diagram of an apparatus of this invention
  • FIGURE 2 is an enlarged view of parts of the apparatus viewed from the opposite side from FIGURE 1 with parts broken away;
  • FIGURE 3 is a view taken on the line 3-3 of FIG- URE 2;
  • FIGURE 4 is a schematic diagram of a modified apparatus of this invention.
  • Patented Jan. 31, 1967 have generally met with failure although it is still recognized that the blast furnace has severaldisadvantages.
  • a semi-steel with a composition roughly 1-2% C, 0.5% Si and 0.25% S could be made in a high temperature reactor with operating costs being in the same order as the costs of pig iron production.
  • steel can be made having about 0.014% C, a carbon to silicon ratio as desired and sulfur at the 0.03% level,
  • the instant invention is exceedingly flexible in being operative when using iron ore of practically any grade, scrap, mixtures of ore and scrap.
  • almost any carbonaceous solid fuel such as coke or coal of any grade and mixtures thereof are also operative.
  • recycling fuel gases and refining the molten iron directly from the stack conserves heat and has obvious thermal advantages.
  • bavebe'en developed which offer an economically attractive alternative to the blast furnace.
  • the present invention is chiefly based on the discovery that by utilizing certain preferred process techniques and by adhering to a certain coordinated combination of critical operating conditions, the reduction of iron ore can be accomplished in a practical and efiicient manner so that an economic advantage over known direct iron ore methods are achieved. Moreover, in the instant process, iron ore can be reduced by using a low grade of coke, the gas produced by the combustion thereof being coordinated with the gas requirements of the process thereby obtaining minimum fuel consumption, and all of the chemical and thermal requirements are satisfied.
  • the process may therefore be termed a balanced process in that operational difficulties have been overcome by using a reducing chamber, passing molten iron from this chamber directly into a container in which refining can be carried out while continuously passing hot carbon monoxide gas directly from the refining vessel to the reduction chamber.
  • the carbon monoxide gas moves counter-current to the iron and the starting materials as they pass downwardly, the iron being subjected to a reducing operation.
  • the reduction is also assisted by passing heated air and oxygen in regulated proportions upwardly in the reduction chamber.
  • FIGURES 1-3 a source of iron, iron ore pellets or briquettes, is charged into stack 10 together with coal or coke and a flux through the upper open end 12.
  • One or more valves 14 control the pressure maintained within the stack as desired and also serve to divert the vent gases up chimney 16 which gases can be controlled by means of valves 18 and 70 to. recycle through pipe 68 to air heater 56.
  • Air heater 56 has burner 58 supplied by natural ga and air through ducts 64 and 66 to heat air preferably enriched with oxygen. Air and oxygen are supplied to the air heater 56 via ducts 60* and 62. A hot air blast is forced into the lower part of the stack through conduit 54. If desired, vent gases can be added to the hot air blast and the latter fed into the refining vessel above the level of the molten metal. In either case the hot air blast flows upwardly and heats the charge.
  • the initial start-up charge can be of coal or coke followed by iron ore or scrap together with limestone once the temperature reaches about 2500 F.
  • Vessel 28 is divided into two sections by partition 34.
  • the first section is located directly below the stack 10 to collect the molten iron.
  • the other section 32 is the site where refining is section is provided with a safety or explosion vent 48, two or more steel taps 50 and 52 at different levels and conduit 38 for recycling the efiluent gases from the refining step to the lower part of the stack 10. It is preferred to pass these gases through a cinder box to remove entrained solids.
  • Section 30 is provided with a slag tap 74.
  • Steel cover 36 encloses the top of both sections.
  • the sections 30 and 32 are separated b partition 34 which has openings 44 and 46 at the bottom thereof.
  • the normal liquid level of the vessel is above such openings.
  • Thermocouple leads 22, 24, 2'6 and 72 and gas analysis probe 20 are placed so that the temperature and other conditions within the stack can be closely monitored and adjustments made if necessary.
  • the hot blast air heater without oxygen enrichment is started to heat the stack until a temperature of about 500 F. is reached. Then the oxygen jet supplied with natural gas can be started. When the stack temperature reaches about 2000 F., coal or coke is added to the stack and oxygen enrichment of the hot air blast commenced. Once the temperature is raised to about 2500 F. or higher, iron ore or scrap together with a flux are also fed into the stack. Molten metal begins to form as the scrap or iron ore descends down to the collecting section 30 of vessel 28.
  • the refining step can be carried out continuously or intermittently but it is preferred to carry out the refining step simultaneously with the melting of iron so that the effiuent gases which contain a considerable amount of carbon monoxide can be cntinuously cycled to the bottom part of the stack.
  • this exhaust is filtered through a cinder box for removal of solids, particularly entrained metalloids.
  • the exhaust which is substantially carbon monoxide leaves the refining area at a temperature of about 2900 F. and When cycled to the stack, assists in the melting of iron ore or scrap and reduction of iron oxides.
  • the partition 34 serves to prevent any unreduced solid particles from moving to the refining section 32. Also, when the hot air blast is rounted through the melting section 30, the partition 34 is a barrier that prevents excessive air from migrating to the refining section.
  • the two sections are in communication below the normal level of the molten metal whereby mass transfer of the metal in the two sections can occur. The atmospheres in the two sections, however, are different and are maintained separate from one another by cover 36 and partition 34.
  • FIG- URES 1-3 is one that conserves the latent heat of the molten metal by providing a refining vessel which collects the molten metal directly and the recycling arrangement of hot gases which have retained at least some of their capacities to function as fuel.
  • the pressure at the top of stack can be maintained at about 40 p.s.i. by means of valve 14 with or without recycle through valves 18 and 70 and pipe 68.
  • the recycle of vent gases and the maintenance of pressure within the stack 10 are optional measures.
  • FIGURE 4 a stack 101 having a charge 102 of scrap and coke is in continuous operation.
  • Molten iron falls down to refining vessel 103 in section 104.
  • the source of hot air preferably enriched with oxygen, is essentially identical with that shown in FIGURE 1.
  • the blast is fed through conduit 106 to section 104 rather than to the stack.
  • the rate of oxygen is controlled in accordance with the gas analysis of probe 130.
  • the oxygen is controlled so that the gases at probe 130 contain some, but a very small percentage of carbon monoxide.
  • the charge is predominantly iron ore, the oxygen is maintained at a level wherein there is about 35% of carbon monoxide at probe 130.
  • the blast flows upwardly in the stack counter to the flow of molten metal.
  • the vent gases can be tapped and cycled to the hot blast air heater in the same manner as shown in FIGURE 1, but this feature is not essential.
  • Molten metal 107 collects in section 104 and flows to the jet oxygen section 108 through one or more passageways 110 in partition 109.
  • Oxygen lance 111 refines the metal until refined steel or semi-refining steel 112 is produced whereupon such may be tapped at 113, periodically, as it reaches the level indicated in FIGURE 4.
  • the oxygen admitted by lance 111 controls, within limits, the temperature of the molten steel in section 108.
  • the efiluent gases generated by the action of the oxygen lance 1-11 are drawn through conduit 115 to cinder box 116 whereupon solids entrained in the gases are filtered out and the gases, including a high percentage carbon monoxide, are fed to the lower part of stack 101 through conduit 117.
  • An optional arrangement includes the use of a bustle pipe which encircles the stack and has three or more entrance holes into the stack for even distribution. Slag is removed periodically as disclosed in the embodiment of FIGURES l-3.
  • Coke or coal in bin 119 is fed by a stoker 120 at a predetermined rate through passageway 121 and the appropriate amount of flux can also be fed by the same device.
  • scrap or iron ore is fed at a predetermined rate via conduit 125 continuously by stoker 127 from bin 126. These rates are adjusted to maintain the charge 102 at approximately the level shown in FIGURE 4.
  • the vent gas is expelled through chimney 128 or alternatively can be recycled to the stack via the hot blast air heater.
  • the final ingot weight was 120 lbs.
  • the total oxygen consumed was 581 cu. ft. in the jet oxygen section of the refining vessel and 489 cu. ft. in the hot air blast. Some 328 cu. ft. of natural gas was used. Tapping temperature was about 2900 F. Analysis of product was:
  • FIGURE 5 shows a preferred oxygen lance 200 wherein oxygen is forced through supply 201 and pipe 202 concentrically arranged within outer pipe 203. Natural gas is pumped into inlet 204. By means of three or more set screws 205 pipe 202 is centered within outer pipe 203. In one lance, the oxygen was forced from a pressure of about ll-26 psi. and natural gas at about 5-9 p.s.i. The orifice of the oxygen pipe was %-1I1Ch in diameter and the outlet diameter of the outer pipe was -inch, the outer pipe itself being a length of l /z-inch steel pipe. This lance performs well and is less susceptible to erosion because of the cooling effect of the natural gas which surrounds the oxygen pipe.
  • the distance between the end of pipe 202 and pipe 203 should closely approximate one inch when the other dimensions listed above are used.
  • the oxygen jet impinges on the surface of the steel and induces circulation of the molten steel for more complete and uniform refining.
  • the natural gas serves both to heat the steel 112 in section 108 and to prevent consumption of the oxygen-carrying pipe 202
  • other suitable fluids may be employed for both purposes or for the latter purpose only.
  • FIGURE 6 shows an effective feeding apparatus that can be used instead of the stoker arrangement shown in FIGURE 4.
  • Bin 175 containing either carbonaceous fuel or a source of iron is positioned at a higher level than the opening in conduit 176 leading to the stack 101.
  • Bin 175 includes -a sloping bottom part 177 which is provided with a sleeve 178 bridging the stationary bottom part 177 and serpentine passageway 179 which turns about a horizontal axis under the influence of belt 180 and motor 181. Regulating the speed of motor 181 regulates the amount of material fed to the stack.
  • FIGURE 7 shows an alloying chamber 151 wherein molten metal can be drained directly from the jet oxygen section 108 of the refining vessel 103 while still in the molten state 153 and alloyed within chamber 151.
  • Vac uum conduit 154 leads to a vacuum pump so that the appropriate amount of steel can be drawn by regulating the pressure within chamber 151. Degassing is also accomplished with the arrangement shown in FIGURE 7. It is unnecessary that the exit 113 in the refining vessel 103 have a plug and conduit 150 can be cleared by means of the vacuum control system.
  • Alloying materials may be added to section 108 prior to applying the vacuum, or within chamber 151, or at an appropriate entry (not shown) in the conduit 150, or any combination of these.
  • the chamber 151 is provided with a discharge exit 152. With an adjacent continuous casting apparatus and process, this may be maintained opened for the duration of the process.
  • the refined steel can be alloyed in the ladle prior to casting in the usual manner.
  • the present process and apparatus make it unnecessary to transfer by piping the molten iron into a molten iron vessel and from it, or by separate piping to transfer the partially refined product to an oxygen vessel. Not only is this transfer costly in heat losses, but its attendant mechanical difficulties, in piping the hot effluent gases which exceed a temperature of over 2900 F. from the several compartments are for practical application insurmountable. Such transfer lines would require heavy insulation to preserve the latent heat of the gases and to avoid precipitation of the entrained metalloids, which latter can cause plugging of the transfer lines. The use of transfer lines to the oxygen vessel during oxygen injection will also be a difficult task at the operating temperature. i p
  • a process for the production of iron and steel comprising the steps of feeding a source of iron, a solid carbonaceous fuel and flux into the upper part of a heated stack, allowing molten iron to flow by gravity from the bottom of the stack to a first section of a vessel, permitting molten metal to flow from the first section to a second section of said vessel while partitioning the respective atmospheres in each section from one another, maintaining different atmospheres above the molten metal in said sections, jet oxygen refining the molten iron within the second section of said vessel and circulating the hot gaseous efiluents generated by said refining step to the lower part of said stack.
  • vent gases from the top of the stack together with the hot air are passed into the section of the refining vessel in communication with the stack and flow upwardly counter to the flow of molten iron.
  • a process for the production of iron and steel comprising the steps of feeding a source of iron, 21 solid carbonaceous fuel and flux into the upper part of a heated stack, introducing a flow of hot air from the bottom to the upper part of the stack, allowing molten metal to flow by gravity from the bottom of a stack to a sectionalized refining vessel, jet oxygen refining the molten metal within one section of the vessel and circulatin the hot efiluents generated by said refining step through a cinder box to the lower part of said stack.
  • An apparatus comprising a substantially vertically disposed stack for receiving a charge of materials used in the production of iron and steel, acollecting and refining vessel disposed below said stack, said vessel being divided into two sections by a partition, a passageway connecting said sections below the normal liquid level, the first of said sections being a collecting section in direct communication with the lower part of the stack for receiving molten iron, means for introducing an oxygen jet into the second of said sections above the normal liquid level, conduit means for delivering the hot eflluents from said second section to the lower part of said stack said sections having different atmospheres above the molten metal.
  • conduit means for delivering hot effluent includes a cinder box for filtering out entrained solids.
  • a slag outlet is located in said first section in communication with the stack.

Description

Jaw 1967 .J. J. M GLYNN ETAL 3,301,61
PROCESS AND APPARATUS FOR PRODUCING IRON AND STEEL Filed March 25, 1965 4 Sheets-Sheet l IRON ORE PELLETS /2 AIR. HEATER -EXCES5 AIR.
EXCESS OXYGEN GAS PLANT SUPPLY/ INVENTORS JAMES J MCGLVNN JAMES L. MA W/LL/AM H FUNK m 31, 1196 J. J. M GLYNN ETAL 3,301,651
PROCESS AND APPARATUS FOR PRODUCING IRON AND STEEL 4 Sheets-Sheet 2 Filed March 25, 1965 PELLETS INVENTORS JAMES J. MC GLYNN JAMES L. MA
W/LL/AM H FUNK BY ATTORNEYS jam 1967 J. J. M GLYNN ETAL 3,301,551
PROCESS AND APPARATUS FOR PRODUCING IRON AND STEEL Filed March 25, 1965 4 Sheets-Sheet 5 GAS OXYGEN -NATURAL GAS AIR 3 -NAT.
GAS r OXYGEN D 1 10- 3 i I HOT BLAST AIR BURNER HEATER. I
INVENTORS JAMES J MC GLYNN JAMES L. MA W/LL/AM hf FUNK.
ORNEYS Jam 1967 J. J. MCGLYNN ETAL 3,301,61
PROCESS AND APPARATUS FOR PRODUCING IRON AND STEEL Filed March 25, 1965 4 Sheets-Sheet a8 NATURAL GAS N E 6 m 0 INVENTORS JAMES J. MC GLYNN JAMES L. MA
W/LL/AM H FUNK %fl,/%4af I TTORNEYS United States Patent 3,301,661 PROCESS AND APPARATUS FOR PRODUCING IRON AND STEEL James J. McGlynn, Paoli, James L. Ma, West Chester, and William H. Funk, Glen Moore, Pa., assignors to Lukens Steel Company, Coatesville, Pa., a corporation of Pennsylvania Filed Mar. 25, 1965, Ser. No. 442,760 13 Claims. (Cl. 75-40) The invention relates to an improved apparatus and process for the reduction of iron ores, and is a continuation-in-part of application Serial No. 147,886, filed Octo ber 26, 1961, now abandoned, which is a continuation-inpart of application'Serial No. 30,356, filed May 19, 1960, now abandoned, entitled The Reduction of Iron Ores.
There have been several proposals for the production of iron by means other than the classical blast furnace. The reasons for these proposals are several but chiefly relate to the inflexibility of the blast furnace. In brief, the blast furnace must use expensive coke havin-gcertain characteristics. Also the blast furnace must be run at full capacity for efficient operation.
Applications Serial Nos. 147,886 and 30,356 disclose methods and apparatus for the production of iron and steel wherein iron ore, coal or coke and a flux charge are fed into a heated stack whereupon the ore is reduced and the molten iron is allowed to drain into a partitioned vessel. The iron is refined by oxygen lance and the efiluent gases from the refining step supplied to the lower part of the stack. Also hot air, preferably enriched with oxygen, is supplied to the bottom of the stack. This hot air blast can be augmented by recycling the vent gases through the hot air heater. Thermal conservation is realized through the foregoing measures as well as the concept of refining the iron as directly received from the stack while the metal is still in the molten state.
The present application provides for improvements and additions to the previously disclosed inventive concepts but the objectives stated in the parent applications remain generally the same. However, added emphasis is placed on the present developments versatility in being capable of using scrap and other sources of iron as well as coke, coal and other fuels. Accordingly, it is an object of the present invention to provide an improved method and apparatus for the production of iron and steel that are economical and flexible. It is a further object of the present inventionto provide a method and apparatus for the production of iron and steel that are capable of using inexpensive raw materials. It is another object of the present invention to provide a method and apparatus for the production of iron and steel that conserve heat and fuel.
In the drawings:
FIGURE 1 is a schematic diagram of an apparatus of this invention;
FIGURE 2 is an enlarged view of parts of the apparatus viewed from the opposite side from FIGURE 1 with parts broken away;
FIGURE 3 is a view taken on the line 3-3 of FIG- URE 2;
FIGURE 4 is a schematic diagram of a modified apparatus of this invention;
Patented Jan. 31, 1967 have generally met with failure although it is still recognized that the blast furnace has severaldisadvantages. In one development it was reported that a semi-steel with a composition roughly 1-2% C, 0.5% Si and 0.25% S could be made in a high temperature reactor with operating costs being in the same order as the costs of pig iron production. In the instant development it has been found that steel can be made having about 0.014% C, a carbon to silicon ratio as desired and sulfur at the 0.03% level, Moreover, the instant invention is exceedingly flexible in being operative when using iron ore of practically any grade, scrap, mixtures of ore and scrap. Further, almost any carbonaceous solid fuel such as coke or coal of any grade and mixtures thereof are also operative. Moreover, recycling fuel gases and refining the molten iron directly from the stack conserves heat and has obvious thermal advantages. In short, for the first time a process and an apparatus of considerable flexibility bavebe'en developed which offer an economically attractive alternative to the blast furnace.
The present invention is chiefly based on the discovery that by utilizing certain preferred process techniques and by adhering to a certain coordinated combination of critical operating conditions, the reduction of iron ore can be accomplished in a practical and efiicient manner so that an economic advantage over known direct iron ore methods are achieved. Moreover, in the instant process, iron ore can be reduced by using a low grade of coke, the gas produced by the combustion thereof being coordinated with the gas requirements of the process thereby obtaining minimum fuel consumption, and all of the chemical and thermal requirements are satisfied. The process may therefore be termed a balanced process in that operational difficulties have been overcome by using a reducing chamber, passing molten iron from this chamber directly into a container in which refining can be carried out while continuously passing hot carbon monoxide gas directly from the refining vessel to the reduction chamber. The carbon monoxide gas moves counter-current to the iron and the starting materials as they pass downwardly, the iron being subjected to a reducing operation. The reduction is also assisted by passing heated air and oxygen in regulated proportions upwardly in the reduction chamber.
In FIGURES 1-3 a source of iron, iron ore pellets or briquettes, is charged into stack 10 together with coal or coke and a flux through the upper open end 12. One or more valves 14 control the pressure maintained within the stack as desired and also serve to divert the vent gases up chimney 16 which gases can be controlled by means of valves 18 and 70 to. recycle through pipe 68 to air heater 56.
Air heater 56 has burner 58 supplied by natural ga and air through ducts 64 and 66 to heat air preferably enriched with oxygen. Air and oxygen are supplied to the air heater 56 via ducts 60* and 62. A hot air blast is forced into the lower part of the stack through conduit 54. If desired, vent gases can be added to the hot air blast and the latter fed into the refining vessel above the level of the molten metal. In either case the hot air blast flows upwardly and heats the charge. The initial start-up charge can be of coal or coke followed by iron ore or scrap together with limestone once the temperature reaches about 2500 F.
As the steel melts it flows down the stack 10 until it passes out the lower end thereof into the molten iron section 30 of the refining vessel 28. Vessel 28 is divided into two sections by partition 34. The first section is located directly below the stack 10 to collect the molten iron. The other section 32 is the site where refining is section is provided with a safety or explosion vent 48, two or more steel taps 50 and 52 at different levels and conduit 38 for recycling the efiluent gases from the refining step to the lower part of the stack 10. It is preferred to pass these gases through a cinder box to remove entrained solids. Section 30 is provided with a slag tap 74. Steel cover 36 encloses the top of both sections.
As shOWn in FIGURES 2 and 3, the sections 30 and 32 are separated b partition 34 which has openings 44 and 46 at the bottom thereof. The normal liquid level of the vessel is above such openings. Thus the metal received from the stack and the metal being refined are in communication with each other through openings 44 and 46. Thermocouple leads 22, 24, 2'6 and 72 and gas analysis probe 20 are placed so that the temperature and other conditions within the stack can be closely monitored and adjustments made if necessary.
In operation the hot blast air heater without oxygen enrichment is started to heat the stack until a temperature of about 500 F. is reached. Then the oxygen jet supplied with natural gas can be started. When the stack temperature reaches about 2000 F., coal or coke is added to the stack and oxygen enrichment of the hot air blast commenced. Once the temperature is raised to about 2500 F. or higher, iron ore or scrap together with a flux are also fed into the stack. Molten metal begins to form as the scrap or iron ore descends down to the collecting section 30 of vessel 28.
As the level of molten metal builds up within both sections 30 and 32, refining of the metal takes place. The oxygen lance can be adjusted to impinge substantially pure oxygen on the surface of the molten metal and the fuel turned down or off. The heat generated by the reaction of the oxygen with silicon, carbon, and other impurities maintains the metal in a molten state. It will be understood that the refining step can be carried out continuously or intermittently but it is preferred to carry out the refining step simultaneously with the melting of iron so that the effiuent gases which contain a considerable amount of carbon monoxide can be cntinuously cycled to the bottom part of the stack. Preferably also this exhaust is filtered through a cinder box for removal of solids, particularly entrained metalloids. The exhaust which is substantially carbon monoxide leaves the refining area at a temperature of about 2900 F. and When cycled to the stack, assists in the melting of iron ore or scrap and reduction of iron oxides.
The partition 34 serves to prevent any unreduced solid particles from moving to the refining section 32. Also, when the hot air blast is rounted through the melting section 30, the partition 34 is a barrier that prevents excessive air from migrating to the refining section. The two sections are in communication below the normal level of the molten metal whereby mass transfer of the metal in the two sections can occur. The atmospheres in the two sections, however, are different and are maintained separate from one another by cover 36 and partition 34.
It will be apparent that the apparatus shown in FIG- URES 1-3 is one that conserves the latent heat of the molten metal by providing a refining vessel which collects the molten metal directly and the recycling arrangement of hot gases which have retained at least some of their capacities to function as fuel.
If desired, the pressure at the top of stack can be maintained at about 40 p.s.i. by means of valve 14 with or without recycle through valves 18 and 70 and pipe 68. The recycle of vent gases and the maintenance of pressure within the stack 10 are optional measures.
In FIGURE 4 a stack 101 having a charge 102 of scrap and coke is in continuous operation. Molten iron falls down to refining vessel 103 in section 104. The source of hot air, preferably enriched with oxygen, is essentially identical with that shown in FIGURE 1. However the blast is fed through conduit 106 to section 104 rather than to the stack. The rate of oxygen is controlled in accordance with the gas analysis of probe 130. Where the charge is mainly scrap, the oxygen is controlled so that the gases at probe 130 contain some, but a very small percentage of carbon monoxide. However, when the charge is predominantly iron ore, the oxygen is maintained at a level wherein there is about 35% of carbon monoxide at probe 130. The blast flows upwardly in the stack counter to the flow of molten metal. The vent gases can be tapped and cycled to the hot blast air heater in the same manner as shown in FIGURE 1, but this feature is not essential.
Molten metal 107 collects in section 104 and flows to the jet oxygen section 108 through one or more passageways 110 in partition 109. Oxygen lance 111 refines the metal until refined steel or semi-refining steel 112 is produced whereupon such may be tapped at 113, periodically, as it reaches the level indicated in FIGURE 4. The oxygen admitted by lance 111 controls, within limits, the temperature of the molten steel in section 108.
The efiluent gases generated by the action of the oxygen lance 1-11 are drawn through conduit 115 to cinder box 116 whereupon solids entrained in the gases are filtered out and the gases, including a high percentage carbon monoxide, are fed to the lower part of stack 101 through conduit 117. An optional arrangement includes the use of a bustle pipe which encircles the stack and has three or more entrance holes into the stack for even distribution. Slag is removed periodically as disclosed in the embodiment of FIGURES l-3.
Coke or coal in bin 119 is fed by a stoker 120 at a predetermined rate through passageway 121 and the appropriate amount of flux can also be fed by the same device. In a similar arrangement scrap or iron ore is fed at a predetermined rate via conduit 125 continuously by stoker 127 from bin 126. These rates are adjusted to maintain the charge 102 at approximately the level shown in FIGURE 4. The vent gas is expelled through chimney 128 or alternatively can be recycled to the stack via the hot blast air heater.
In the above-described apparatus it will be appreciated that a further scrap charge up to 50% can be added to the jet oxygen section 108 of the vessel as the refining step is carried out. The addition of scrap at this stage is optional.
In an experimental scaled down apparatus like that shown in FIGURE 4 the following charge was processed:
Mill scrap, lbs. Coke, lbs. 45 CaO, lbs 4 CaF lbs. 0.5 CaSi, gms. 300
The final ingot weight was 120 lbs. The total oxygen consumed was 581 cu. ft. in the jet oxygen section of the refining vessel and 489 cu. ft. in the hot air blast. Some 328 cu. ft. of natural gas was used. Tapping temperature was about 2900 F. Analysis of product was:
Percent C 0.02 Mn 0.01 P 0.005 S 0.012 C u 0.07 S1. 0.01 N1 0.05
Other residuals and incidentals were analyzed as negligible. This steel was made from mill scrap. Other sources of iron including mill scale, iron ore of any grade, pig iron, common plate scrap as well as all other types of scrap can be used. Moreover, by properly selecting the scrap and other sources of iron, the final product can be closely controlled so as to analyze within ranges that are prescribed for the better quality steels. The above listed amount of consumed coke, oxygen and natural gas 7 i are considerably lower and efficiency; is increased in larger scale operations. 1
At. a given oxygen rate through the oxygen lance an equilibrium will be reached to produce a decarbonized and desiliconized semi-refined or-completely refined steel as desired wherein control of the chemical make-up of the steel is at least equal to present-day steel refining practices.
FIGURE 5 shows a preferred oxygen lance 200 wherein oxygen is forced through supply 201 and pipe 202 concentrically arranged within outer pipe 203. Natural gas is pumped into inlet 204. By means of three or more set screws 205 pipe 202 is centered within outer pipe 203. In one lance, the oxygen was forced from a pressure of about ll-26 psi. and natural gas at about 5-9 p.s.i. The orifice of the oxygen pipe was %-1I1Ch in diameter and the outlet diameter of the outer pipe was -inch, the outer pipe itself being a length of l /z-inch steel pipe. This lance performs well and is less susceptible to erosion because of the cooling effect of the natural gas which surrounds the oxygen pipe. The distance between the end of pipe 202 and pipe 203 should closely approximate one inch when the other dimensions listed above are used. .The oxygen jet impinges on the surface of the steel and induces circulation of the molten steel for more complete and uniform refining. Whereas the natural gas serves both to heat the steel 112 in section 108 and to prevent consumption of the oxygen-carrying pipe 202, other suitable fluids may be employed for both purposes or for the latter purpose only.
FIGURE 6 shows an effective feeding apparatus that can be used instead of the stoker arrangement shown in FIGURE 4. Bin 175 containing either carbonaceous fuel or a source of iron is positioned at a higher level than the opening in conduit 176 leading to the stack 101. Bin 175 includes -a sloping bottom part 177 which is provided with a sleeve 178 bridging the stationary bottom part 177 and serpentine passageway 179 which turns about a horizontal axis under the influence of belt 180 and motor 181. Regulating the speed of motor 181 regulates the amount of material fed to the stack.
FIGURE 7 shows an alloying chamber 151 wherein molten metal can be drained directly from the jet oxygen section 108 of the refining vessel 103 while still in the molten state 153 and alloyed within chamber 151. Vac uum conduit 154 leads to a vacuum pump so that the appropriate amount of steel can be drawn by regulating the pressure within chamber 151. Degassing is also accomplished with the arrangement shown in FIGURE 7. It is unnecessary that the exit 113 in the refining vessel 103 have a plug and conduit 150 can be cleared by means of the vacuum control system.
Alloying materials may be added to section 108 prior to applying the vacuum, or within chamber 151, or at an appropriate entry (not shown) in the conduit 150, or any combination of these. The chamber 151 is provided with a discharge exit 152. With an adjacent continuous casting apparatus and process, this may be maintained opened for the duration of the process.
Alternative to the alloy chamber, the refined steel can be alloyed in the ladle prior to casting in the usual manner.
The present process and apparatus make it unnecessary to transfer by piping the molten iron into a molten iron vessel and from it, or by separate piping to transfer the partially refined product to an oxygen vessel. Not only is this transfer costly in heat losses, but its attendant mechanical difficulties, in piping the hot effluent gases which exceed a temperature of over 2900 F. from the several compartments are for practical application insurmountable. Such transfer lines would require heavy insulation to preserve the latent heat of the gases and to avoid precipitation of the entrained metalloids, which latter can cause plugging of the transfer lines. The use of transfer lines to the oxygen vessel during oxygen injection will also be a difficult task at the operating temperature. i p
Current prices for scrap steel provides a real advantage of the instant process and apparatus. Also, briquetted low grade coal and ores can be used instead of high cost cokeand high grade ore providing an 'additional economic advantage. i
The above description and drawings disclose only a few embodiments of the invention, and specific language has been employed in describing the several figures. It will, nevertheless, be understood that no limitations of the scope of the invention are thereby contemplated, and that various alterations and modifications may be made such as would occur to one skilled in the art to which the invention relates.
We claim:
1. A process for the production of iron and steel comprising the steps of feeding a source of iron, a solid carbonaceous fuel and flux into the upper part of a heated stack, allowing molten iron to flow by gravity from the bottom of the stack to a first section of a vessel, permitting molten metal to flow from the first section to a second section of said vessel while partitioning the respective atmospheres in each section from one another, maintaining different atmospheres above the molten metal in said sections, jet oxygen refining the molten iron within the second section of said vessel and circulating the hot gaseous efiluents generated by said refining step to the lower part of said stack.
2. The invention of claim 1 wherein the source of iron is comprised at least in part of scrap.
3. The process of claim 1 wherein the vent gases from the top of the stack are recycled to the lower part of the stack with heated air.
4. The process of claim 1 wherein the vent gases from the top of the stack together with the hot air are passed into the section of the refining vessel in communication with the stack and flow upwardly counter to the flow of molten iron.
5. The process of claim 1 wherein a flow of hot air is introduced into said first section to circulate upwardly into the stack counter to the flow of molten metal.
6. A process for the production of iron and steel comprising the steps of feeding a source of iron, 21 solid carbonaceous fuel and flux into the upper part of a heated stack, introducing a flow of hot air from the bottom to the upper part of the stack, allowing molten metal to flow by gravity from the bottom of a stack to a sectionalized refining vessel, jet oxygen refining the molten metal within one section of the vessel and circulatin the hot efiluents generated by said refining step through a cinder box to the lower part of said stack.
7. The process of claim 5 wherein the hot air is oxygen enriched.
8. An apparatus comprising a substantially vertically disposed stack for receiving a charge of materials used in the production of iron and steel, acollecting and refining vessel disposed below said stack, said vessel being divided into two sections by a partition, a passageway connecting said sections below the normal liquid level, the first of said sections being a collecting section in direct communication with the lower part of the stack for receiving molten iron, means for introducing an oxygen jet into the second of said sections above the normal liquid level, conduit means for delivering the hot eflluents from said second section to the lower part of said stack said sections having different atmospheres above the molten metal.
9. The apparatus of claim 8 wherein the conduit means for delivering hot effluent includes a cinder box for filtering out entrained solids.
10. The apparatus of claim 8 wherein a slag outlet is located in said first section in communication with the stack.
11. The apparatus of claim 8 wherein an alloying containe-r is in communication with the refining vessel and 328,042 10/1885 Lysett 266-11 vacuum control means is connected to the alloying con- 675,329 5/1901 Heskett et al. 75-60 tainer for controlling the flow of steel to said container. 780,651 1/ 1905 Gerard 266-11 12. The apparatus of claim 8 wherein means is pro- 2,034,071 3/1936 Wickland 75-43 vided for regulating the pressure at the top of the stack. 5 2,192,885 3/ 1940 Avery 75-41 13. The apparatus of claim 8 wherein means is pro- 2,811,435 10/ 1957 Bannister et a1 75-60 vided for introducing hot air into said first section above 3,231,253 1/ 1966 Thompson 75-46 X the level of molten metal. FOREIGN PATENTS References Cited by the Examiner 10 7,287 1898 Great Britain- UNITED STATES PATENTS DAVID L. RECK, Primary Examiner.
145,843 12/ 1873 Carpenter 266-11 X H. W. TARRING, Assistant Examiner.

Claims (2)

1. A PROCESS FOR THE PRODUCTION OF IRON AND STEEL COMPRISING THE STEPS OF FEEDING A SOURCE OF IRON, A SOLID CARBONACEOUS FUEL AND FLUX INTO THE UPPER PART OF A HEATED STACK, ALLOWING MOLTEN IRON TO FLOW BY GRAVITY FROM THE BOTTOM OF THE STACK TO A FIRST SECTION OF A VESSEL, PERMITTING MOLTEN METAL TO FLOW FROM THE FIRST SECTION TO A SECOND SECTION OF SAID VESSEL WHILE PARTITIONING THE RESPECTIVE ATMOSPHERES IN EACH SECTION FROM ONE ANOTHER, MAINTAINING DIFFERENT ATMOSPHERES ABOVE THE MOLTEN METAL IN SAID SECTIONS, JET OXYGEN REFINING THE MOLTEN IRON WITHIN THE SECOND SECTION OF SAID VESSEL AND CIRCULATING THE HOT GASEOUS EFFLUENTS GENERATED BY SAID REFINING STEP TO THE LOWER PART OF SAID STACK.
8. AN APPARATUS COMPRISING A SUSTANTIALLY VERTICALLY DISPOSED STACK FOR RECEIVING A CHARGE OF MATERIALS USED IN THE PRODUCTION OF IRON AND STEEL, A COLLECTING AND REFINING VESSEL DISPOSED BELOW SAID STACK, SAID VESSEL BEING DIVIDED INTO TWO SECTIONS BY A PARTITION, A PASSAGEWAY CONNECTING SAID SECTIONS BELOW THE NORMAL LIQUID LEVEL, THE FIRST OF SAID SECTIONS BEING A COLLECTING SECTION IN DIRECT COMMUNICATION WITH THE LOWER PART OF THE STACK FOR RECEIVING MOLTEN IRON, MEANS FOR INTRODUCING AN OXYGEN JET INTO THE SECOND OF SAID SECTIONS ABOVE THE NORMAL LIQUID LEVEL, CONDUIT MEANS FOR DELIVERING THE HOT EFFLUENTS FROM SAID SECOND SECTION TO THE LOWER PART OF SAID STACK SAID SECTIONS HAVING DIFFERENT ATMOSPHERES ABOVE THE MOLTEN METAL.
US442760A 1965-03-25 1965-03-25 Process and apparatus for producing iron and steel Expired - Lifetime US3301661A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US442760A US3301661A (en) 1965-03-25 1965-03-25 Process and apparatus for producing iron and steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US442760A US3301661A (en) 1965-03-25 1965-03-25 Process and apparatus for producing iron and steel

Publications (1)

Publication Number Publication Date
US3301661A true US3301661A (en) 1967-01-31

Family

ID=23758038

Family Applications (1)

Application Number Title Priority Date Filing Date
US442760A Expired - Lifetime US3301661A (en) 1965-03-25 1965-03-25 Process and apparatus for producing iron and steel

Country Status (1)

Country Link
US (1) US3301661A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3356488A (en) * 1964-02-24 1967-12-05 John H Walsh Process for utilizing hydrocarbon injection into hot reducing gases in steelmaking
US3424573A (en) * 1964-11-02 1969-01-28 Rocco Catoggio De Villiers Process for combined oxygen iron refining and producing of ferrous melts
US3951644A (en) * 1974-05-06 1976-04-20 Heatran, Inc. Method of producing iron and steel from iron ore
US3953196A (en) * 1974-04-05 1976-04-27 Obenchain Richard F Process for the direct reduction of metal oxides
US4012226A (en) * 1973-05-25 1977-03-15 Klockner-Werke Ag Process for steel production
US4072504A (en) * 1973-01-26 1978-02-07 Aktiebolaget Svenska Kullagerfabriken Method of producing metal from metal oxides
US4111687A (en) * 1976-11-01 1978-09-05 Consolidated Natural Gas Service Company, Inc. Process for the production of intermediate hot metal

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US145843A (en) * 1873-12-23 Improvement in the manufacture of iron and steel
US328042A (en) * 1885-10-13 Combined cupola-furnace and converter
GB189807287A (en) * 1898-03-25 1899-02-11 Alexander Sattmann Improvements in the Manufacture of Iron and Steel, and in Apparatus employed therein.
US675329A (en) * 1897-09-24 1901-05-28 Thomas James Heskett Process of manufacturing steel.
US780651A (en) * 1902-01-27 1905-01-24 Syndicat De L Acier Gerard Process of separating metals from their ores.
US2034071A (en) * 1932-08-15 1936-03-17 Algot A Wickland Metallurgical furnace
US2192885A (en) * 1938-03-10 1940-03-12 Little Inc A Blast furnace power system
US2811435A (en) * 1956-03-26 1957-10-29 British Oxygen Co Ltd Treatment of fumes in steelmaking operations
US3231253A (en) * 1963-02-28 1966-01-25 Malleable Iron Fittings Co Apparatus for producing more than one grade of malleable iron from a single high carbon charge thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US145843A (en) * 1873-12-23 Improvement in the manufacture of iron and steel
US328042A (en) * 1885-10-13 Combined cupola-furnace and converter
US675329A (en) * 1897-09-24 1901-05-28 Thomas James Heskett Process of manufacturing steel.
GB189807287A (en) * 1898-03-25 1899-02-11 Alexander Sattmann Improvements in the Manufacture of Iron and Steel, and in Apparatus employed therein.
US780651A (en) * 1902-01-27 1905-01-24 Syndicat De L Acier Gerard Process of separating metals from their ores.
US2034071A (en) * 1932-08-15 1936-03-17 Algot A Wickland Metallurgical furnace
US2192885A (en) * 1938-03-10 1940-03-12 Little Inc A Blast furnace power system
US2811435A (en) * 1956-03-26 1957-10-29 British Oxygen Co Ltd Treatment of fumes in steelmaking operations
US3231253A (en) * 1963-02-28 1966-01-25 Malleable Iron Fittings Co Apparatus for producing more than one grade of malleable iron from a single high carbon charge thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3356488A (en) * 1964-02-24 1967-12-05 John H Walsh Process for utilizing hydrocarbon injection into hot reducing gases in steelmaking
US3424573A (en) * 1964-11-02 1969-01-28 Rocco Catoggio De Villiers Process for combined oxygen iron refining and producing of ferrous melts
US4072504A (en) * 1973-01-26 1978-02-07 Aktiebolaget Svenska Kullagerfabriken Method of producing metal from metal oxides
US4012226A (en) * 1973-05-25 1977-03-15 Klockner-Werke Ag Process for steel production
US3953196A (en) * 1974-04-05 1976-04-27 Obenchain Richard F Process for the direct reduction of metal oxides
US3951644A (en) * 1974-05-06 1976-04-20 Heatran, Inc. Method of producing iron and steel from iron ore
US4111687A (en) * 1976-11-01 1978-09-05 Consolidated Natural Gas Service Company, Inc. Process for the production of intermediate hot metal

Similar Documents

Publication Publication Date Title
EP0605535B1 (en) Process for production of iron
CA1214333A (en) Method and a melt-down gasifier for producing molten pig iron or steel pre-products
KR0159789B1 (en) A smelting reduction
US3460934A (en) Blast furnace method
EP0074270B1 (en) Process and apparatus for continuous steel-making
CN85108059A (en) Produce the method and apparatus of the sponge iron or the pig iron
US9499872B2 (en) Iron reduction process and equipment
US5258054A (en) Method for continuously producing steel or semi-steel
JP2975260B2 (en) Steel production method
CA1049792A (en) Process and apparatus for producing molten iron
US5060913A (en) Integrated metallurgical reactor
JPS6294792A (en) Method and device for continuously preheating charging material for steel-making furnace
HU184306B (en) Process and equipment for reducing granular iron oxide and for producing iron melt
US3301661A (en) Process and apparatus for producing iron and steel
PL76243B1 (en)
PL322871A1 (en) Method of and apparatus for producing smolten iron by multizonal smelting process
US6409790B1 (en) Method and apparatus for practicing carbonaceous-based metallurgy
US4670049A (en) Oxygen blast furnace for direct steel making
US1357781A (en) Blast treatment of metals
US4116678A (en) Method of producing iron
US3615351A (en) Direct gaseous reduction of iron oxide
US2750278A (en) Smelting process
EP0793731B1 (en) Process and apparatus for the manufacture of steel from iron carbide
US4147334A (en) Method and apparatus of producing iron
US2136360A (en) Process for reducing iron in a blast furnace

Legal Events

Date Code Title Description
AS Assignment

Owner name: LUKENS, INC., 50 SOUTH FIRST AVENUE, COATESVILLE,

Free format text: CHANGE OF NAME;ASSIGNOR:LUKENS STEEL COMPANY;REEL/FRAME:003997/0281

Effective date: 19820512